Directory Details

Dubai Electricity and Water Authority PJSC, R&D Department, BD&E Division

Initial Accreditation Date:Feb 06 , 2025

Contacts Info

Address

United Arab Emirates

Email

VP.RD@dewa.gov.ae

Phone No.

undefined

Mobile No.

undefined

Main Field

Testing Laboratories

Valid Since:Feb 06 , 2025

Type of Activity Test Materials / Products Test Name Test Method Status
Electrical
  • Electrical Testing
  • Photovoltaic (PV) Modules
  • Visual Inspection (MQT 01 and MST 01) "Qualitative"
IEC 61215 Part 2 Clause 4.1Active
IEC 61730 Part 2 Clause 10.2Active
  • Stabilization (MQT 19) "Qualitative"
IEC 61215 Part 2 Clause 4.19Active
IEC TS 63209 Part 1 Clause 5.4Active
  • Maximum Power Determination (MQT 02 and MST 03) 1 W to 900 W
IEC 61215 Part 2 Clause 4.2Active
IEC 61730 Part 2 Clause 10.4Active
  • Insulation Test (MQT 03 and MST 16) 100 V DC to 12000 V DC
IEC 61215 Part 2 Clause 4.3Active
IEC 61730 Part 2 Clause 10.13Active
IEC TS 63209 Part 1 Clause 5.6Active
  • Wet Leakage Current Test (MQT 15 and MST 17) 1 Mohm to 50000 Mohm
IEC 61215 Part 2 Clause 4.15Active
IEC 61730 Part 2 Clause 10.14Active
IEC TS 63209 Part 1 Clause 5.7Active
  • Bypass Diode Thermal Test (MQT 18.1 and MST 25) -65 °C to 220 °C
IEC 61215 Part 2 Clause 4.18.1Active
IEC 61730 Part 2 Clause 10.19Active
  • Hot-spot Endurance Test (MST 22 and MQT 09) "Qualitative" (Irradiance: 700 W/m² to 1350 W/m²)
IEC 61215 Part 2 Clause 4.9Active
IEC 61730 Part 2 Clause 10.16Active
  • Reverse Current Overload Test (MST 26) "Qualitative" (Current: 1 A DC to 100 A DC)
IEC 61730 Part 2 Clause 10.20Active
  • Bypass Diode Functionality Test (MQT 18.2 and MST 07) "Qualitative" (Power: 1 W to 900 W & 0 A to 50 A)
IEC 61215 Part 2 Clause 4.18.2Active
IEC 61730 Part 2 Clause 10.8Active
  • Continuity Test of Equipotential Bonding (MST 13) "Qualitative" (0.1 A to 100 A)
IEC 61730 Part 2 Clause 10.11Active