header("Access-Control-Allow-Origin: *"); ?>
Initial Accreditation Date:Nov 29 , 2024
Dubai, United Arab Emirates
0
0
0
Inspection Category | Inspection field | Range of inspection | Stage of Inspection | Inspection criteria | Inspection Activity Type | Status |
---|---|---|---|---|---|---|
Regulatory Inspection | ||||||
|
|
|
| DMBACD- ST-PR07-7.2' Aris flow chart ANNEX 5-4 DM-BACDST- PR07-7.2-P1-01 DMBACD-ST-PR07-7.2' Aris flow chart ANNEX 5-4 DM-BACDST-PR07-7.2-P1-01 | A | Active |
|
| DMBACD-ST-PR07-7.2 Aris flow chart ANNEX 5-4 'Inspection procedures DMBACD-ST-PR07-7.2 Control Construction Section procedure 'DMBACD-ST-PR07-7.2-P2-01 | A | Active | ||
|
| DMBACD- ST-PR07-7.2 Aris flow chart ANNEX 5-4 Inspection procedures DMBACD-ST-PR07-7.2 Control Construction Section procedure DMBACD-ST-PR07-7.2-P2-01 | A | Active | ||
|
|
| Inspection procedures DMBACD-ST-PR07-7.2 Aris flow chart ANNEX 5-4 Building Control Section: procedure DM-BACDST-PR07-7.2-P2-01 | A | Active | |
|
|
| Inspection procedures DMBACD-ST-PR07-7.2 | A | Active | |
|
|
| Inspection procedures 'DMBACD-ST-PR07-7.2 ' Aris flow chart ANNEX 5-4 | A | Active | |
|
| Inspection procedures DMBACD-ST-PR07-7.2 Aris flow chart ANNEX 5-4 | A | Active | ||
|
|
| Engineering evaluation and demo. Procedure BACDST-PR07-7.2- P1-01 | A | Active |